File #: AI 17-062    Version: 1 Name: Surface Water Main Improvements Phase 3 Consultant Agreement
Type: Action Item Status: Passed
File created: 2/28/2017 In control: CITY COUNCIL REGULAR
On agenda: 3/6/2017 Final action:
Title: Authorized the Mayor to sign the professional services agreement with CH2M Hill Engineers, Inc. for design and construction assistance for the 544 Zone Surface Water Main Improvements Phase 3 Project in an amount not to exceed $217,769. Drinking Water State Revolving Fund (DWSRF) loans administered by the Washington State Department of Health (WSDOH) have been used since 2012 to complete surface water upgrades including the Slow Sand Water Filter Plant and two phases of surface water transmission main replacements. This third surface water transmission main upgrade project funded through the DWSRF loans will replace a 7,300 foot section of old pipeline from the end of the new treated water pipelines at the Slow Sand Water Treatment Plant to a new treated water pipeline at NE Ireland Way and NE 312th Avenue. This main is represented by the blue line on the attached map. (Submitted by James Carothers)
Attachments: 1. Surface Water Main Phase 3 Consultant Agreement, 2. Surface Water System Base Map
Related files: REP 17-078, REP 18-142, AI 18-072
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Authorized the Mayor to sign the professional services agreement with CH2M Hill Engineers, Inc. for design and construction assistance for the 544 Zone Surface Water Main Improvements Phase 3 Project in an amount not to exceed $217,769. Drinking Water State Revolving Fund (DWSRF) loans administered by the Washington State Department of Health (WSDOH) have been used since 2012 to complete surface water upgrades including the Slow Sand Water Filter Plant and two phases of surface water transmission main replacements. This third surface water transmission main upgrade project funded through the DWSRF loans will replace a 7,300 foot section of old pipeline from the end of the new treated water pipelines at the Slow Sand Water Treatment Plant to a new treated water pipeline at NE Ireland Way and NE 312th Avenue. This main is represented by the blue line on the attached map. (Submitted by James Carothers)