File #: REP 17-078    Version: 1 Name: Surface Water Main Improvements Phase 3 Consultant Agreement
Type: Informational Report Status: Meeting Item
File created: 2/14/2017 In control: CITY COUNCIL WORKSHOP
On agenda: 2/21/2017 Final action:
Title: 544 Zone Surface Water Main Improvements Phase 3 Consultant Agreement Details: Drinking Water State Revolving Fund (DWSRF) loans administered by the Washington State Department of Health (WSDOH) have been used since 2012 to complete surface water upgrades including the slow sand water filter plant and two phases of surface water transmission main replacements. Staff proposed beginning the design of what would be the third surface water transmission main upgrade project funded through the DWSRF Loans. A draft of the consultant agreement with CH2M HILL for this design work is attached. This 7,300 feet of main begins at NE 312th Avenue and NE Ireland Road and heads northeast to a new line located just south of the slow sand water filter plant. This main is represented by the blue line on the attached map. Staff provided an overview and update of the related funding and improvements. Presenter: James Carothers, Engineering Manager and Steve Wall, Public Works Director
Attachments: 1. Surface Water Main Phase 3 Consultant Agreement, 2. Surface Water System Base Map
Related files: REP 16-400, AI 17-062, REP 18-142
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

544 Zone Surface Water Main Improvements Phase 3 Consultant Agreement

Details:  Drinking Water State Revolving Fund (DWSRF) loans administered by the Washington State Department of Health (WSDOH) have been used since 2012 to complete surface water upgrades including the slow sand water filter plant and two phases of surface water transmission main replacements. Staff proposed beginning the design of what would be the third surface water transmission main upgrade project funded through the DWSRF Loans. A draft of the consultant agreement with CH2M HILL for this design work is attached. This 7,300 feet of main begins at NE 312th Avenue and NE Ireland Road and heads northeast to a new line located just south of the slow sand water filter plant. This main is represented by the blue line on the attached map. Staff provided an overview and update of the related funding and improvements.

Presenter:  James Carothers, Engineering Manager and Steve Wall, Public Works Director

Recommended Action

Recommended Action:  Staff recommends this agreement be placed on the March 6, 2017 Consent Agenda for Council's Consideration.