File #: AI 15-202    Version: 1 Name: The Lofts at Camas Meadows Design Review
Type: Action Item Status: Passed
File created: 5/11/2015 In control: DESIGN REVIEW COMMITTEE
On agenda: 5/20/2015 Final action: 5/20/2015
Title: The Lofts at Camas Meadows Details: Proposal to construct two 4-story buildings with 104 one and two bedroom apartment units. The Design Review Committee (DRC) must provide a recommendation to the decision makers that includes consideration of the general design review standards of Camas Municipal Code (CMC) Chapter 18.19 Design Review, and the Camas Design Review Manual (DRM); along with specific standards for gateways and for multifamily developments. Also, the associated decisions for the project included conditions that are relevant to the design of the development, and require approval from the Design Review Committee. Presenter: Lauren Hollenbeck, Senior Planner
Attachments: 1. Exhibit 1 - The Lofts at Camas Meadows Staff Report, 2. Exhibit 2 - Design Review Checklist, 3. Exhibit 3 - Camas Design Review Manual, 4. Exhibit 4- Applicant's Narrative, 5. Exhibit 5 - Tree Evaluation Report, 6. Exhibit 6 - Lighting Drawings, 7. Exhibit 7 - Lighting Specs, 8. Exhibit 8 - Site Plan, 9. Exhibit 9 - Preliminary Grading plan, 10. Exhibit 10 - Preliminary Stormwater Plan, 11. Exhibit 11 - Elevations, 12. Exhibit 12 - Floor Plans, 13. Exhibit 13 - Clubhouse elevations, 14. Exhibit 14 - Preliminary Landscape Plan, 15. Exhibit 15 - Planting Details, 16. Exhibit 16 - Renderings
Related files: RES 15-004
Title
The Lofts at Camas Meadows
Details: Proposal to construct two 4-story buildings with 104 one and two bedroom apartment units. The Design Review Committee (DRC) must provide a recommendation to the decision makers that includes consideration of the general design review standards of Camas Municipal Code (CMC) Chapter 18.19 Design Review, and the Camas Design Review Manual (DRM); along with specific standards for gateways and for multifamily developments. Also, the associated decisions for the project included conditions that are relevant to the design of the development, and require approval from the Design Review Committee.
Presenter: Lauren Hollenbeck, Senior Planner
Recommended Action
Recommended Action: That the Design Review Committee reviews the submitted materials, deliberates, and forwards a recommendation to the Director for a final decision.