Title:
|
Camas Transportation Corridors Study
Details: HDJ, a division of PBS, was hired by Camas staff to perform a study of two vital Camas corridors. The first corridor is an existing arterial consisting of NW 6th Avenue, NE 6th Avenue and SR-500 that is comprised of NE Garfield Street, NE 14th Avenue and NE Everett Street. The purpose of the study was to determine the future needs for all users and to further define desired projects for this corridor that could be included in the City's Capital Improvement Plan. The second corridor considered in this study is a proposed arterial across the North Shore properties. This future three-lane multimodal arterial will eventually replace Leadbetter Road along the Lacamas Lake frontage with a route farther north. HDJ was assigned to look at environmental, topographical and zoning elements of the underdeveloped properties between NE 232nd Avenue (northwesterly limit of corridor) and NE Everett Street (SR-500) near its intersection with NE Garfield Str...
|