File #: REP 16-410    Version: 1 Name: Camas Transportation Corridors Study
Type: Informational Report Status: Meeting Item
File created: 10/12/2016 In control: PLANNING COMMISSION
On agenda: 10/18/2016 Final action:
Title: Camas Transportation Corridors Study Details: HDJ, a division of PBS, was hired by Camas staff to perform a study of two vital Camas corridors. The first corridor is an existing arterial consisting of NW 6th Avenue, NE 6th Avenue and the SR-500 corridor that is comprised of NE Garfield Street, NE 14th Avenue and NE Everett Street. The purpose of this investigation is to determine the future needs and desires of all users and to work toward the definition and implementation of desired projects for this corridor. The second corridor considered in this study is a proposed arterial across the North Shore properties. This future 3 lane multimodal arterial will eventually replace Leadbetter Road along the Lacamas Lake frontage with a route farther north. HDJ was assigned to look at environmental, topographical and zoning elements of the underdeveloped properties between NE 232nd Avenue and NE Everett Street (SR-500) near its intersection with NE Garfield Street. The purpose of this investiga...
Attachments: 1. Transportation Corridors Study Presentation
Related files: REP 15-376, AI 15-305, REP 16-487, REP 18-003
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Camas Transportation Corridors Study

Details: HDJ, a division of PBS, was hired by Camas staff to perform a study of two vital Camas corridors. The first corridor is an existing arterial consisting of NW 6th Avenue, NE 6th Avenue and the SR-500 corridor that is comprised of NE Garfield Street, NE 14th Avenue and NE Everett Street. The purpose of this investigation is to determine the future needs and desires of all users and to work toward the definition and implementation of desired projects for this corridor. The second corridor considered in this study is a proposed arterial across the North Shore properties. This future 3 lane multimodal arterial will eventually replace Leadbetter Road along the Lacamas Lake frontage with a route farther north. HDJ was assigned to look at environmental, topographical and zoning elements of the underdeveloped properties between NE 232nd Avenue and NE Everett Street (SR-500) near its intersection with NE Garfield Street. The purpose of this investigative work is to provide greater clarity and assurances of an arterial roadway alignment to the property owners in the North Shore area as they work toward plans for development.

Presenter: James Carothers, Engineering Manager

Recommended Action

Recommended Action: Staff is seeking comments from the Planning Commission regarding the findings and staff recommendations from the study of these corridors. Comments will be forwarded to Council.