REP 15-425
| 1 | B. | Job Description Revisions | Informational Report | Administrative Services Department Position Description Revisions
Details: Position descriptions for two positions within the department are being revised, both in title and function, to meet the changing needs of the department and the City and overall City operations. There are no proposed changes to salary scales and the staffing for the department remains the same.
Presenter: Jennifer Gorsuch, Administrative Services Director | | |
Not available
|
Video
|
|
REP 15-419
| 1 | C. | | Informational Report | Grand Ridge Annexation Area Zoning Designation
Details: The City is considering an annexation of land into the City limits. A zoning designation needs to be set for the annexation area before it becomes incorporated into the City limits.
Presenter: Robert Maul, Planning Manager | | |
Not available
|
Video
|
|
Cdm 15-120
| 1 | D. | Community Development Miscellaneous Items | Informational Report | Community Development Miscellaneous and Updates
Details: This is a placeholder for miscellaneous or emergent items.
Presenter: Phil Bourquin, Community Development Director | | |
Not available
|
Video
|
|
REP 15-426
| 1 | E. | WS-756 Change Order 2 | Informational Report | NW 6th Avenue Water and Storm Sewer Improvements Change Order No. 2 for WS-756
Details: This second project change order is for the repair of two undocumented pipes, the required modification of a newly installed catch basin, and materials and standby time associated with the discovery of a differing valve connection. This change order removes a number of unused items from the project resulting in a net credit for this change order. The cost for this additional work is ($9,552.76) and is funded by the General Obligation Bond.
Presenter: James Carothers, Engineering Manager | | |
Not available
|
Video
|
|
REP 15-427
| 1 | F. | WS-714 Change Order 1 | Informational Report | STEP Sewer Transmission Main Project Change Order No. 1 for WS-714
Details: This change order is for the addition of two sanitary sewer services at the control building for wells 10, 11 and 12, for Concrete Products, additional brush clearing not called out in the plans, and excavation for additional required archaeological investigation. The cost for this additional work is $13,354.68 and is funded by a Public Works Trust Fund loan.
Presenter: James Carothers, Engineering Manager | | |
Not available
|
Video
|
|
REP 15-428
| 1 | G. | WS-709C Change Order 1 | Informational Report | Slow Sand Water Treatment Plant Project Change Order No. 1 for WS-709C
Details: This change order is for the upsizing of the treated and raw water pipes in order to gain full use of the water rights from Boulder Creek and for the added cost of one row of aesthetic cement masonry unit blocks around the administration building. The cost for this additional work is $40,673.99 and is funded by the Washington State Department of Health Drinking Water State Revolving Loan Fund.
Presenter: James Carothers, Engineering Manager | | |
Not available
|
Video
|
|
Pwm 15-119
| 1 | H. | Public Works Miscellaneous and Updates | Informational Report | Public Works Miscellaneous and Updates
Details: This is a placeholder for miscellaneous or emergent items.
Presenter: Steve Wall, Public Works Director | | |
Not available
|
Video
|
|
Cam 15-121
| 1 | I. | Administration Miscellaneous Items | Informational Report | City Administrator Miscellaneous Updates and Scheduling
Details: This is a placeholder for miscellaneous or scheduling items.
Presenter: Jennifer Gorsuch, Administrative Services Director | | |
Not available
|