Meeting Details

Meeting Name: SHORELINE MANAGEMENT REVIEW COMMITTEE Agenda status: Final
Meeting date/time: 6/7/2018 4:00 PM Minutes status: Final  
Meeting location:
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments: June 7, 2018 Shoreline Management Review Committee Meeting Packet
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
REP 18-281 1A. Informational ReportOverview of the Shoreline Management Review Committee   Action details Not available
AI 18-123 1A.Lacamas North Trail (SHOR18-02)Action ItemShoreline Substantial Development and Shoreline Variance Permit for Lacamas North Shore Trail Project Details: The city proposes to construct a new section of trail to extend the existing trail system at the south end of Lacamas Lake, which will require approval of a Shoreline Substantial Development and Shoreline Variance Permit (SHOR18-02). The new trail segment would be located on City property on the northeast side of Lacamas Lake, from an existing trail on the east side of NE Everett Street to a natural area on the lakeshore. Public comments are attached to the record. Comments are generally opposed to the public's use of the park that is adjacent to their properties. A staff report provides the applicable approval criteria. Presenter: Sarah Fox, Senior Plannerrecommended for approvalPass Action details Video Video
AI 18-122 1B.Hubbard Dock (SHOR18-01)Action ItemShoreline Substantial Development and Shoreline Variance Permit for Hubbard Dock Details: The applicant, Brant Hubbard, requests approval of a Shoreline Substantial Development Permit and Shoreline Variance (SHOR18-01) to construct a private dock. The proposed dock will be located at 1180 SE Polk Street, on the Columbia River. The project will require a variance due to the need for 12-inch pilings, and for the length of the gangway. A staff report provides the applicable approval criteria. Presenter: Sarah Fox, Senior Plannerforwarded without recommendationPass Action details Video Video
AI 18-124 1C.Georgia-Pacific Fire System (SHOR18-03)Action ItemShoreline Substantial Development Permit for the Georgia-Pacific Fire System Improvement Project Details: Georgia-Pacific requests approval of a Shoreline Substantial Development Permit (SHOR18-03) for a Fire System Improvement Project. The proposed project includes replacing a diesel powered pump with an electric pump and back-up generator. The project is located at the terminus of NE 3rd Avenue, along the Camas Slough of the Columbia River, within the "High Intensity" shoreline designation. A staff report provides the applicable approval criteria. Presenter: Sarah Fox, Senior Plannerrecommended for approvalPass Action details Video Video