|
REP 18-281
| 1 | A. | | Informational Report | Overview of the Shoreline Management Review Committee | | |
Action details
|
Not available
|
|
AI 18-123
| 1 | A. | Lacamas North Trail (SHOR18-02) | Action Item | Shoreline Substantial Development and Shoreline Variance Permit for Lacamas North Shore Trail Project
Details: The city proposes to construct a new section of trail to extend the existing trail system at the south end of Lacamas Lake, which will require approval of a Shoreline Substantial Development and Shoreline Variance Permit (SHOR18-02). The new trail segment would be located on City property on the northeast side of Lacamas Lake, from an existing trail on the east side of NE Everett Street to a natural area on the lakeshore. Public comments are attached to the record. Comments are generally opposed to the public's use of the park that is adjacent to their properties. A staff report provides the applicable approval criteria.
Presenter: Sarah Fox, Senior Planner | recommended for approval | Pass |
Action details
|
Video
|
|
AI 18-122
| 1 | B. | Hubbard Dock (SHOR18-01) | Action Item | Shoreline Substantial Development and Shoreline Variance Permit for Hubbard Dock
Details: The applicant, Brant Hubbard, requests approval of a Shoreline Substantial Development Permit and Shoreline Variance (SHOR18-01) to construct a private dock. The proposed dock will be located at 1180 SE Polk Street, on the Columbia River. The project will require a variance due to the need for 12-inch pilings, and for the length of the gangway. A staff report provides the applicable approval criteria.
Presenter: Sarah Fox, Senior Planner | forwarded without recommendation | Pass |
Action details
|
Video
|
|
AI 18-124
| 1 | C. | Georgia-Pacific Fire System (SHOR18-03) | Action Item | Shoreline Substantial Development Permit for the Georgia-Pacific Fire System Improvement Project
Details: Georgia-Pacific requests approval of a Shoreline Substantial Development Permit (SHOR18-03) for a Fire System Improvement Project. The proposed project includes replacing a diesel powered pump with an electric pump and back-up generator. The project is located at the terminus of NE 3rd Avenue, along the Camas Slough of the Columbia River, within the "High Intensity" shoreline designation. A staff report provides the applicable approval criteria.
Presenter: Sarah Fox, Senior Planner | recommended for approval | Pass |
Action details
|
Video
|