File #: AI 16-167    Version: 1 Name: Public Hearing Six-Year Transportation Plan 2017 through 2022
Type: Action Item Status: Passed
File created: 5/27/2016 In control: CITY COUNCIL REGULAR
On agenda: 6/6/2016 Final action: 6/6/2016
Title: Public Hearing Considering the Six-Year Transportation Improvement Program for Years 2017 Through 2022 Details: The Six-Year Transportation Program is to be updated by municipal agencies annually per Revised Code of Washington (RCW) 35.77.010. Projects from the Capital Facilities Plan, Transportation Impact Fee Study Update and the North Dwyer Creek Master Plan are included in this plan as well as safety and maintenance and preservation items. Projects are dropped from the list annually once the construction phase has started and is fully funded. Staff has revised the attached list and map to reflect comments made by Council at the May 16, 2016 Council Workshop and via email. The SR-500 Lake Road Corridor Feasibility Study has been moved up the priority list to precede the Lake Road and Everett Roundabout Project. A bicycle and pedestrian improvements project has been added as Priority 28 for Brady Road from McIntosh Road to the west city limits. The attached appendices identify the c...
Attachments: 1. Six Year Street Plan List Hearing Draft, 2. Six Year Street Plan Map Hearing Draft, 3. Six Year Street Plan Appendices
Related files: REP 15-275, AI 15-231, RES 15-003, REP 16-221

Title

Public Hearing Considering the Six-Year Transportation Improvement Program for Years 2017 Through 2022

Details:  The Six-Year Transportation Program is to be updated by municipal agencies annually per Revised Code of Washington (RCW) 35.77.010. Projects from the Capital Facilities Plan, Transportation Impact Fee Study Update and the North Dwyer Creek Master Plan are included in this plan as well as safety and maintenance and preservation items. Projects are dropped from the list annually once the construction phase has started and is fully funded. Staff has revised the attached list and map to reflect comments made by Council at the May 16, 2016 Council Workshop and via email. The SR-500 Lake Road Corridor Feasibility Study has been moved up the priority list to precede the Lake Road and Everett Roundabout Project. A bicycle and pedestrian improvements project has been added as Priority 28 for Brady Road from McIntosh Road to the west city limits. The attached appendices identify the coding on the list. There has been no public testimony received to date. Notice of this public hearing was posted on the Camas website, at the Post Office, City Hall, Camas Library and in the Camas-Washougal Post-Record.

Presenter:  James Carothers, Engineering Manager

Recommended Action

Recommended Action:  Staff recommends that Council conduct a public hearing, deliberate on comments and recommended changes, and direct the City Attorney to prepare a resolution adopting the desired changes to the Six-Year Transportation Improvement Program at the June 20, 2016 Regular Council meeting.