Title:
|
Camas Transportation Corridors Study
Details: HDJ, a division of PBS, was hired by Camas staff to perform a study of two vital Camas corridors. The first corridor is an existing arterial consisting of NW 6th Avenue, NE 6th Avenue and the SR-500 corridor that is comprised of NE Garfield Street, NE 14th Avenue and NE Everett Street. The purpose of this investigation is to determine the future needs and desires of all users and to work toward the definition and implementation of desired projects for this corridor. The second corridor considered in this study is a proposed arterial across the North Shore properties. This future 3 lane multimodal arterial will eventually replace Leadbetter Road along the Lacamas Lake frontage with a route farther north. HDJ was assigned to look at environmental, topographical and zoning elements of the underdeveloped properties between NE 232nd Avenue and NE Everett Street (SR-500) near its intersection with NE Garfield Street. The purpose of this investiga...
|