File #: AI 17-009    Version: 1 Name: Water Transmission Main Phase 2 Pay Estimate 4 Final
Type: Action Item Status: Passed
File created: 1/4/2017 In control: CITY COUNCIL REGULAR
On agenda: 2/6/2017 Final action:
Title: Authorized Pay Estimate No. 4, Final, to McDonald Excavating, Inc. for the Water Transmission Main Phase 2 Project, a portion of the 544' Zone Water Main and Treatment Projects, in the amount of $41,091.61 for work through December 17, 2016, and accepted the project as complete. This project is part of the original Washington State Department of Health (WSDOH) Drinking Water State Revolving Fund (DWSRF) Loan scope and was completed within the budget. The final pay estimate total was 1.5% under the awarded construction bid. The final expenditures detail spreadsheet is attached. (Submitted by James Carothers)
Attachments: 1. Water Transmission Main Phase 2 Pay Estimate 4 Final, 2. Water Transmission Main Phase 2 Expenditure Summary
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Authorized Pay Estimate No. 4, Final, to McDonald Excavating, Inc. for the Water Transmission Main Phase 2 Project, a portion of the 544' Zone Water Main and Treatment Projects, in the amount of $41,091.61 for work through December 17, 2016, and accepted the project as complete. This project is part of the original Washington State Department of Health (WSDOH) Drinking Water State Revolving Fund (DWSRF) Loan scope and was completed within the budget. The final pay estimate total was 1.5% under the awarded construction bid. The final expenditures detail spreadsheet is attached. (Submitted by James Carothers)