Legislation Details

File #: AI 18-160    Version: 1 Name: Public Hearing Hubbard Dock (SHOR18-01)
Type: Action Item Status: Meeting Item
File created: 7/11/2018 In control: HEARINGS EXAMINER
On agenda: 8/16/2018 Final action:
Title: Public Hearing for Hubbard Dock Details: The applicant, Brant Hubbard, requests approval of a Shoreline Substantial Development Permit and Shoreline Variance (SHOR18-01) to construct a private dock. The proposed dock will be located at 1180 SE Polk Street, on the Columbia River. The project will require a variance due to the need for 12-inch pilings, and for the length of the gangway. A staff report provides the applicable approval criteria. The Shoreline Management Review Committee referred the decision to the city's hearings examiner. Presenter: Sarah Fox, Senior Planner
Sponsors: Sarah Fox
Attachments: 1. Staff Report, 2. Presentation by staff (SHOR18-01), 3. 1-Application Materials and Biological Report, 4. 2-Critical Areas Report for Dock, 5. 3-Ecology Comment, 6. 4-Carol Buck Comment, 7. 5-Andreas and April Juretzka Comment, 8. 6-Carol Buck Comment on June 3 2018, 9. 7-Hubbbard Dock Drawing, 10. 8-Minutes from Public Meeting, 11. 9-Ecology Comment July 19 2018, 12. 10-Application Addendum 20180716, 13. 11-Juretzka_Buck Presentation

Title

Public Hearing for Hubbard Dock

Details: The applicant, Brant Hubbard, requests approval of a Shoreline Substantial Development Permit and Shoreline Variance (SHOR18-01) to construct a private dock. The proposed dock will be located at 1180 SE Polk Street, on the Columbia River. The project will require a variance due to the need for 12-inch pilings, and for the length of the gangway. A staff report provides the applicable approval criteria. The Shoreline Management Review Committee referred the decision to the city's hearings examiner.

Presenter:  Sarah Fox, Senior Planner

Recommended Action

Recommended Action:  Staff recommends that the Hearings Examiner review the permit application, conduct a public hearing, deliberate, and render a decision. The local decision will be forwarded to the Department of Ecology for final permit approval.