Legislation Details

File #: AI 18-124    Version: 1 Name: Georgia-Pacific Fire System (SHOR18-03)
Type: Action Item Status: Reported to Council
File created: 5/31/2018 In control: SHORELINE MANAGEMENT REVIEW COMMITTEE
On agenda: 6/7/2018 Final action:
Title: Shoreline Substantial Development Permit for the Georgia-Pacific Fire System Improvement Project Details: Georgia-Pacific requests approval of a Shoreline Substantial Development Permit (SHOR18-03) for a Fire System Improvement Project. The proposed project includes replacing a diesel powered pump with an electric pump and back-up generator. The project is located at the terminus of NE 3rd Avenue, along the Camas Slough of the Columbia River, within the "High Intensity" shoreline designation. A staff report provides the applicable approval criteria. Presenter: Sarah Fox, Senior Planner
Sponsors: Sarah Fox
Attachments: 1. Georgia-Pacific Staff Report (SHOR18-03), 2. 1 _Diesel Fire Pump Application Narrative, 3. 2_Diesel Fire Pump Replacement JARPA, 4. 3_Ecology Comments, 5. 4_ Public Comment from Roberts, 6. 5_Fire Pump Replacement Drawing

Title

Shoreline Substantial Development Permit for the Georgia-Pacific Fire System Improvement Project

Details:  Georgia-Pacific requests approval of a Shoreline Substantial Development Permit (SHOR18-03) for a Fire System Improvement Project. The proposed project includes replacing a diesel powered pump with an electric pump and back-up generator. The project is located at the terminus of NE 3rd Avenue, along the Camas Slough of the Columbia River, within the "High Intensity" shoreline designation. A staff report provides the applicable approval criteria.

Presenter:  Sarah Fox, Senior Planner

Recommended Action

Recommended Action:  Staff recommends that the Shoreline Management Review Committee reviews the permit application, deliberates, and moves to recommend approval as provided in the staff report. The decision of the Committee will be final after a 14-day local appeal period.