File #: AI 16-301    Version: 1 Name: Northshore Sewer (SHOR16-04)
Type: Action Item Status: Passed
File created: 10/26/2016 In control: SHORELINE MANAGEMENT REVIEW COMMITTEE
On agenda: 11/3/2016 Final action: 11/3/2016
Title: Shoreline Substantial Development, Variance, and Conditional Use Permit for the Camas Northshore Sewer Transmission System Details: The City of Camas filed an application for a Shoreline Substantial Development Permit, Shoreline Conditional Use Permit, and Shoreline Variance to construct the Northshore Sewer Transmission System (File No. SHOR16-04). The project includes construction of a series of pump stations, an odor control facility, force mains, and gravity sewer pipelines to convey wastewater to the existing gravity sewer system at NE Franklin Street. The new sewer system will extend approximately 4.6 miles from NE Franklin Street to NE Goodwin Road. The staff report and application materials are available to review. Presenter: Sarah Fox, Senior Planner
Attachments: 1. Northshore Sewer Staff Report (SHOR16-04), 2. Northshore Sewer Application Submittal, 3. Northshore Sewer Application Addendum, 4. Northshore Sewer SEPA Addendum, 5. Northshore Sewer SEPA Determination (SEPA16-16)

Title

Shoreline Substantial Development, Variance, and Conditional Use Permit for the Camas Northshore Sewer Transmission System

Details: The City of Camas filed an application for a Shoreline Substantial Development Permit, Shoreline Conditional Use Permit, and Shoreline Variance to construct the Northshore Sewer Transmission System (File No. SHOR16-04). The project includes construction of a series of pump stations, an odor control facility, force mains, and gravity sewer pipelines to convey wastewater to the existing gravity sewer system at NE Franklin Street. The new sewer system will extend approximately 4.6 miles from NE Franklin Street to NE Goodwin Road. The staff report and application materials are available to review.
Presenter: Sarah Fox, Senior Planner
Recommended Action
Recommended Action: Staff recommends that the Shoreline Management Review Committee open the public meeting, review the application, deliberate, request clarification (if any) and render a decision, which will be forwarded to the Department of Ecology for a final decision.